Sunday, 19 August 2012

Project 4: The Capitol

General Brief:

Redesigning ‘The Capitol’ cinema located on Grand Parade in Cork city centre as a Bar-Restaurant-Cabaret-Nightclub Art Deco building.
The space needs a completely new internal layout as well as a new exterior facade that is attractive and stylish.
The target audience will be adult, aged 21 and more. 
It has to be very glamour, ‘Brulesque’ environment that attracts and invites customers coming in, so attention will need to be paid to rich colours and minimalist design.
Here are the other required spaces that will need to be incorporated:
- Information desk
- Restaurant reception area
- Cloak room
- Restaurant waiting room
- Restaurant
- Bar
- Nightclub
- Out door sitting area
- Kitchen
- Cold room / Pantry
- Cleaning room
- Kitchen staff changing room
- Toilets / Shower room
- Cabaret stage / back stage
- Lifts / Stairs 
- Fire escapes


Key Design Requirements:

- New logo using the same name ‘The Capitol’
- New and existing facade
- Information desk
- Restaurant
- Nightclub
- Out door sitting area
- Practical floor layout
- Universal accessibility


Board N:1



Board N:2


Ground Floor Plan Video



First Floor Plan Video



Second Floor Plan Video



01.01.Ground Floor Plan



01.01a.Ground Floor Plan Staff Traffic Flow



01.01b.Ground Floor Plan Customer Traffic Flow



01.01c.Ground Floor Plan Wheelchair Traffic Flow



01.02.First Floor Plan



01.02a.First Floor Plan Staff Traffic Flow



01.02b.First Floor Plan Customer Traffic Flow



01.02c.First Floor Plan Wheelchair Traffic Flow



01.03.Second Floor Plan



01.03a.Second Floor Plan Staff Traffic Flow



01.03b.Second Floor Plan Customer Traffic Flow



01.03c.Second Floor Plan Wheelchair Traffic Flow



02.01.Front Elevation



03.01.Section AA



03.02.Section BB



04.01.Front Entrance Door Detail



04.02.Internal Door Detail



04.03.Information Desk



04.04.Restaurant Reception Desk

Thursday, 2 February 2012

Project 3: Sleep Tight

General Brief:

Designing a resting box for airports, train stations, festivals, concerts and natural disaster camps.
The resting box is used by everyone and must include a universal toilet, single or double bed size, bedside locker, flat screen television, WiFi, a folded shelf for laptop and lighting system.
The look required is modern, with a pleasing aesthetic and sophisticated ambiance.
The logo must be attractive and incorporated in the design.

I took inspiration from my own experience as I love and enjoy travelling. Lately I was in South Africa for my vacation and slept on the bench at Johannesburg airport as my connection flight was delayed to Durban.
It is at this moment precisely I thought that something must be created for people’s flight delayed or canceled for having a rest as travelling can be exhausting and frustrating.  
Watching the news daily, I felt sorry for American citizens when hurricane Irene hit the United States east coast in the end of August 2011. I thought that my resting box could be used for natural disaster camps.




Mood Board



Plan Board



3D Visualisation Board



Model Board



01.01.Ground Floor Plan



01.02.Ground Floor Plan with Services



02.01.Front Elevation



02.02.Side Elevation



03.01.Section AA



03.02.Section BB



04.01.Logo

Project 2: REMI

General Brief:

Students are required to design a retail outlet for a very exclusive shopping mall in Knightsbridge London.
The shopping centre is used by rich and famous. The look required is modern, with a pleasing aesthetic, sophisticated ambiance and an element of shock. Access to the shop should suit everyone, including the disabled.
Display stands should be individually commissioned to give the shop a strong corporate image.
The client requires original packaging vessels incorporating corporate logo. 





Mood Board



Sketch Board N:1



Sketch Board N:2



Sketch Board N:3



3D Visualisation Board



Facade Board



Interior Board




Model Board



Vessel Board



01.01.Ground Floor Plan



01.01a.Ground Floor Plan Staff Traffic Flow



01.01b.Ground Floor Plan Customer Traffic Flow



01.01c.Ground Floor Plan Wheelchair traffic Flow



01.02.Reflected Ceiling Plan



02.01.Front Elevation



03.01.Sections AA and BB



04.01.Ground Floor Plan with Services



05.01.Vessel Template



06.01.Shoe/Boot Display Unit